Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



VIA 67 is passing a pair of dwarf signals at Cape, with the one at left showing a Slow to Clear indication for nearby VIA 62. Up above, work progresses on the REM light rail project. A bit to the left two catenary supports from a much older and long out of use electrification project still remain. CN passenger trains through here were electrified from roughly 1940 to 1960.
Copyright Notice: This image ©Michael Berry all rights reserved.



Caption: VIA 67 is passing a pair of dwarf signals at Cape, with the one at left showing a Slow to Clear indication for nearby VIA 62. Up above, work progresses on the REM light rail project. A bit to the left two catenary supports from a much older and long out of use electrification project still remain. CN passenger trains through here were electrified from roughly 1940 to 1960.

Photographer:
Michael Berry [4080] (more) (contact)
Date: 10/20/2021 (search)
Railway: VIA Rail (search)
Reporting Marks: VIA 909 (search)
Train Symbol: VIA 67 (search)
Subdivision/SNS: CN Montreal Sub (search)
City/Town: Montreal (search)
Province: Quebec (search)
Share Link: http://www.railpictures.ca/?attachment_id=46897
Click here to Log-in or Register and add your vote.

5 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 650 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 45638

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

3 Comments
  1. I still can’t believe the size of the REM light rail project, how fast it’s going up, and how much money is being spent on it.

    Montreal sure knows how to deploy infrastructure.

  2. Billions of wasted dollars, don’t get me started….

  3. :( *cries in 401 gridlock*

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us