Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community!
click here to sign up for an account today. Sick of this message? Get rid of it by
logging-in here.
Nice power!!! So it is 1992 and the hillside is already getting overgrown………
FYI the speed there was never 15mph. Was at 30 then. Now at 40. The Cowpath is 15mph
I thought it was about 15 MPH myself. And I remember occasionally a guy sitting there with a ‘radar gun’ or something noting speeds back in the ’70s.
I can check my old timetables but i can’t say i remember it being that slow. Especially when they need to take a run at the “hill”
Okay. it is just that I can vividly recall those old F units sounding like rattle traps as they accelerated into the curve. As in like they might cough and die before they got anywhere. Would have made a great video for VIA travel back then……..NOT.
I pulled out my old 1985 timetable, and 0.0 to 0.5 on the Dundas Sub shows 15mph.I don’t remember hearing much about stalls, although the slag train we tried to take to Paris went into emergency 4 different times climbing the hill. I wish I’d taken my camera to work in those days, but it just wasn’t done…or I was chicken.
Thanks Dave, saved me having to look it up. 0.-0.5 is on the west end of the S curve. The trains were not as heavy then and of course they would just put all kinds of power on those trains back then.
Many Railpictures.ca members will recall that trains to and from the Dundas sub received “red over green” signals–”Slow to Clear” (Slow speed of 15 mph through turnouts and then Clear/track speed). Circa 1997, DV plates were place and Diverging Speed (25 mph) was authorized (presumably after the turnouts were upgraded). After the relay- based controlled location was replaced for the third track (fall 2006), speeds were increase to what they are today.