Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Their train order read in part: "Do not exceed 20 mph while handling dimensional loads BAWX 100 and BAWX 102...…".  Another boiler for Ontario Hydro's Darlington Nuclear Generation Station heads east on the Halton Sub.
Copyright Notice: This image ©First954 all rights reserved.



Caption: Their train order read in part: "Do not exceed 20 mph while handling dimensional loads BAWX 100 and BAWX 102...…". Another boiler for Ontario Hydro's Darlington Nuclear Generation Station heads east on the Halton Sub.

Photographer:
First954 [280] (more) (contact)
Date: 04/28/1984 (search)
Railway: Canadian National (search)
Reporting Marks: BAWX 100 (search)
Train Symbol: Extra 4596 East (search)
Subdivision/SNS: Humber Mile 4.3 Halton Sub (search)
City/Town: Humber (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=41094
Click here to Log-in or Register and add your vote.

11 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1727 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 39887

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

7 Comments
  1. Impressive, to say the least. And come to think of it, I don’t think I have ever seen Babcock & Wilcox flats roll by me.

  2. This cool. Would have originated off the Fergus Sub near Galt, to the Guelph sub.

    I don’t think we’ll be seeing anymore though, CN seems to have ripped up the line south of Eagle St in Preston.

  3. Thanks Stephen, and we probably won’t see any more nuclear power plants being built any time soon!!

  4. Babcock is still churning out the vessels..

    http://www.railpictures.ca/?attachment_id=30737

    They are shipping a couple dozen smaller vessels over next couple years to Bruce Nuclear. And the link above was brand new for a power plant under contruction (however, it was halted, but the 10 year lead time meant things were still being delivered)

    The babcock moves were the most interesting movements on the Guelph sub aside from GMD london exports.

  5. Ripped up south of Eagle Street? There were empty centerbeams parked south of Eagle barely a month ago.

  6. Anyone know how much this component weighed

  7. This is a steam boiler and Darlington Nuclear Generation station has 16 of these. Each weighed between 750 and 760,000 pounds.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us