Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



The Humber River CN Railway Bridge crosses th
e mouth of the Humber River, south of The 
Queensway and north of Lake Shore Boulevard 
and the Gardiner Expressway. Constructed in 
1911 for the Grand Trunk Railway, this four-track ra
ilway bridge consists 
of steel plate girders 
spanning a concrete substructure. Two spans are 
carried by a central stone pier and abutments, 
which incorporate portions of 
the nineteenth century stone a
butments that supported the Great 
Western Railway bridge that previously occupied the site. 
The property holds physical value as a unique 
integration of 19th a
nd early-20th century 
bridge construction methods and materials. Subs
equent modifications to
 enable the bridge’s 
ongoing use have not significantly de
tracted from its integrity and 
legibility as an amalgam of 
construction techniques from two distinct periods. 

The old span is moved on to the waiting flatcar. It will be secured for movement to Mimico. 
The Western Bridge Co. Designed and built this span crane specifically for this job. It was assembled on site the night before the first span was removed.
Copyright Notice: This image ©ngineered4u all rights reserved.



Caption: The Humber River CN Railway Bridge crosses th e mouth of the Humber River, south of The Queensway and north of Lake Shore Boulevard and the Gardiner Expressway. Constructed in 1911 for the Grand Trunk Railway, this four-track ra ilway bridge consists of steel plate girders spanning a concrete substructure. Two spans are carried by a central stone pier and abutments, which incorporate portions of the nineteenth century stone a butments that supported the Great Western Railway bridge that previously occupied the site. The property holds physical value as a unique integration of 19th a nd early-20th century bridge construction methods and materials. Subs equent modifications to enable the bridge’s ongoing use have not significantly de tracted from its integrity and legibility as an amalgam of construction techniques from two distinct periods. The old span is moved on to the waiting flatcar. It will be secured for movement to Mimico. The Western Bridge Co. Designed and built this span crane specifically for this job. It was assembled on site the night before the first span was removed.

Photographer:
ngineered4u [65] (more) (contact)
Date: 09/22/2018 (search)
Railway: GO Transit (search)
Reporting Marks: Metrolinx (search)
Train Symbol: Not Provided
Subdivision/SNS: Oakville (search)
City/Town: Humber Bay (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=35050
Click here to Log-in or Register and add your vote.

14 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 2514 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 33861

Sorry, there is no map for this photo. Photographer did not add GPS co-ordinates. Please add next time or ask for a correction to this photo.



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

2 Comments
  1. Remarkable stuff, Sire!!

  2. :)

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us