Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Rolling across the Otonabee River bridge (built 1913) in downtown Peterborough, tri-weekly CP train T08 is on its way to Havelock and Blue Mountain with a short, 8 car consist.  Power is a pair of GP20C-ECO's 2231, 2270  and GP38-2 3042.  In the background is the Quaker Oats mill.
Copyright Notice: This image ©Tony Bock all rights reserved.



Caption: Rolling across the Otonabee River bridge (built 1913) in downtown Peterborough, tri-weekly CP train T08 is on its way to Havelock and Blue Mountain with a short, 8 car consist. Power is a pair of GP20C-ECO's 2231, 2270 and GP38-2 3042. In the background is the Quaker Oats mill.

Photographer:
Tony Bock [74] (more) (contact)
Date: 11/25/2022 (search)
Railway: Canadian Pacific (search)
Reporting Marks: CP 2231 (search)
Train Symbol: TO8 (search)
Subdivision/SNS: Havelock Sub (search)
City/Town: Peterborough (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=50436
Click here to Log-in or Register and add your vote.

12 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 809 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 49147

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

8 Comments
  1. When does the train to Toronto and back usually run?

  2. Tues. Thurs, Sat EB, Weds, Fri, Sun WB

  3. any idea when they usually leave Toronto heading east?

  4. If you’re looking for timing, they usually leave Toronto around 6-6:30am and get to Havelock around 2:00pm, although switching and crew changes if needed can make the arrival time in Havelock vary a bit

  5. Very nice Tony, great reflection, good view of the bridge with the Quaker Oats building in the background. Is it still in operation ? Thanks for posting, John

  6. railwayguy, Thanks for your comments. Quaker Oats is still in operation, and even looking for help. It is still rail connected, but doesn’t seem to have had any service for some time.

  7. Thanks for the update

  8. CP is working to resume service on the Quaker spur soon and has been doing some major track work on the line over the past few months. There is no confirmed date of when the line will be ready, but I have been told it is almost ready to go.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us