Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



CN train 218 takes the siding at Barrie, Ontario for a meet with the northbound Super Continental.  Normal power for most trains at that time, but a somewhat abnormal routing for 218 going down the Newmarket Sub. Power for 218 was 9579 9590 and 9545.  Unfortunately, the track shown here is just history.
Copyright Notice: This image ©First954 all rights reserved.



Caption: CN train 218 takes the siding at Barrie, Ontario for a meet with the northbound Super Continental. Normal power for most trains at that time, but a somewhat abnormal routing for 218 going down the Newmarket Sub. Power for 218 was 9579 9590 and 9545. Unfortunately, the track shown here is just history.

Photographer:
First954 [280] (more) (contact)
Date: 09/01/1979 (search)
Railway: Canadian National (search)
Reporting Marks: CN 9579 (search)
Train Symbol: 218 (search)
Subdivision/SNS: Barrie Mile 63.0 Newmarket Sub (search)
City/Town: Barrie (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=50235
Click here to Log-in or Register and add your vote.

20 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1090 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 48946

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

3 Comments
  1. Nice view of the bay also. Livestock cars on the headend, heading for the Ponderosa at Mac Yard.

  2. Beautiful! Such a shame the line to the north was removed.

  3. Took a few 218′s east to Wainwright in the late 70′s, most of the speed trains going east at the time had very similar power assignments. The straight piece of track that starts at Tofield was great for letting these trains stretch their legs. Until the weather got hot and the CWR started with the sunkinks.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us