Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Beginning the climb at Glendale Ave., St. Catharines Mile 7.9 TRRY 1859 is completing the climb up the Niagara Escarpment along side the Welland Canal in Thorold.
Copyright Notice: This image ©Terry O'Shell all rights reserved.



Caption: Beginning the climb at Glendale Ave., St. Catharines Mile 7.9 TRRY 1859 is completing the climb up the Niagara Escarpment along side the Welland Canal in Thorold.

Photographer:
Terry O'Shell [152] (more) (contact)
Date: 08/10/2023 (search)
Railway: GIO Rail (search)
Reporting Marks: TRRY 1859 (search)
Train Symbol: Not Provided
Subdivision/SNS: Thorold Spur Mile 4.90 (search)
City/Town: Thorold (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=52665
Click here to Log-in or Register and add your vote.

15 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 617 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 51360

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

11 Comments
  1. I’d love to hear an MLW run again!!

  2. Trillium or Ontario Southland Railway are your destinations. OSR is taking out 182 occasionally these days, it’s going out along with the SW1200′s.

    Trillium you have a really good chance tuesdays and thursdays.

  3. RS18U #1859 is running a fair bit lately.
    I heard its getting tired and when GP35 # 3502 gets fixed the 1859 may get relegated to standby duty !

  4. What’s wrong with 3502?

  5. Not sure its sitting at Phillips Rd awaiting LDS to fix.
    Been sitting for 3 wks now! With Steel Car on strike I think there was no rush to fix it.
    Lambton has repaired other units on site at the Phillips Rd shop area. With the strike settled the need for its service will come shortly.

  6. Is there more business coming for trenergy in st catharines related to nsc? I thought the coils were done. None seen at nsc lately

  7. Coils have been done for sometime now. Closer to the end of June I believe.

  8. There is another batch with NCLX reporting marks coming some time soon. They are NSC lease fleet cars.
    A Trillium worker told me another 400.
    Time will tell!

  9. Gio is doing lots of track work and tie replacements all over their system so their positioning themselves to handle more business. Spotted inbound scrap gons for SLM at feeder. Scrap prices are very high right now so SLM is working all out to catch up. With Tier 4 compliance and 30 yr old monster locos there will be lots more being sold for scrap. Sad really ,these were built for only one purpose.

  10. Now that the NSC strike is settled let’s hope TRENERGY gets their new commitment for additional covers, don’t be too surprised if some or all are made at an alternate site in central Niagara, so keep your eyes open and scanners on for what could be very interesting railroading ahead.

  11. Not all that many places in Niagara with rail service and the people to do the work.
    Trenergy would be the logical choice.
    The weeds on Trillium and CN in Niagara are so out of control they may need metal detectors to find the rails to do much more track rehab.!

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us