Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



A typical winter afternoon, I was the headend brakeman on the Exeter Switcher and we paused at Lone Butte for a picture or two. The Exeter Switcher did the bulk of work at Exeter (100 Mile House) switching several sawmills, plywood plant, bulk oil spur as well as other smaller customer trackage. After those chores were completed, we head south and switched several mills along the way. Quite often we ran as far south as Lime siding and switched the copper ore loading ramp and cement silos. We were a "full crew", Conductor, Engineer and two Brakemen. It was a long day working, quite often on duty 14 or 16 hours. Our home base on this job was Exeter Two crews worked this assignment in Exeter, each crew working 3 days and then 4 days off. Pay wise it was lucrative, but, the four days off was the real incentive.
The old water tower was a reminder of the days of steam. The tower is still there, a group of local residents have taken on the preservation. Lone Butte was a time table "additional flag stop" for the passenger train.
as a footnote, this slide is part of Bruce Mercer collection
Copyright Notice: This image ©Doug Lawson all rights reserved.



Caption: A typical winter afternoon, I was the headend brakeman on the Exeter Switcher and we paused at Lone Butte for a picture or two. The Exeter Switcher did the bulk of work at Exeter (100 Mile House) switching several sawmills, plywood plant, bulk oil spur as well as other smaller customer trackage. After those chores were completed, we head south and switched several mills along the way. Quite often we ran as far south as Lime siding and switched the copper ore loading ramp and cement silos. We were a "full crew", Conductor, Engineer and two Brakemen. It was a long day working, quite often on duty 14 or 16 hours. Our home base on this job was Exeter Two crews worked this assignment in Exeter, each crew working 3 days and then 4 days off. Pay wise it was lucrative, but, the four days off was the real incentive. The old water tower was a reminder of the days of steam. The tower is still there, a group of local residents have taken on the preservation. Lone Butte was a time table "additional flag stop" for the passenger train. as a footnote, this slide is part of Bruce Mercer collection

Photographer:
Doug Lawson [248] (more) (contact)
Date: 02/??/1979 (search)
Railway: BC Rail (search)
Reporting Marks: BCOL 606 (search)
Train Symbol: Exeter Switcher (search)
Subdivision/SNS: Lone Butte / Lillooet sub (search)
City/Town: Lone Butte (search)
Province: British Columbia (search)
Share Link: http://www.railpictures.ca/?attachment_id=29832
Click here to Log-in or Register and add your vote.

13 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1733 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 28664

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.
No comments yet, be the first by adding yours below

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us