Caption: A reassigned slug set for the Goderich Exeter's Guelph Junction Railway operation is seen at the GJR/CN interchange on XT99, delivered by CN over the weekend. In the foreground is the newly completed XT99a, a second interchange track at this location. Space has been tight on the GJR the last few years, and continued expansion has been a priority, with XT99 being extended late in 2023, and XT97, another interchange track located around the wye off to the left, being added in 2020.
|