Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Oshawa Revitalization

QGRY 3548 basks in the remaining sunlight of a chilly January day while the crew prepares to switch out truck frame flatcars at the GM Plant in Oshawa, Ontario. A long, hard fight was needed to keep this plant alive, otherwise GM would’ve pulled out of Oshawa completely and produced all vehicles in Mexico to maximize profits.
Copyright Notice: This image ©Liam MacDougall all rights reserved.



Caption: Oshawa Revitalization

QGRY 3548 basks in the remaining sunlight of a chilly January day while the crew prepares to switch out truck frame flatcars at the GM Plant in Oshawa, Ontario. A long, hard fight was needed to keep this plant alive, otherwise GM would’ve pulled out of Oshawa completely and produced all vehicles in Mexico to maximize profits.

Photographer:
Liam MacDougall [149] (more) (contact)
Date: 01/21/2022 (search)
Railway: Genesee & Wyoming (search)
Reporting Marks: QGRY 3548 (search)
Train Symbol: Not Provided
Subdivision/SNS: CN Oshawa (search)
City/Town: Oshawa (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=47764
Click here to Log-in or Register and add your vote.

20 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1391 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 46491

Sorry, there is no map for this photo. Photographer did not add GPS co-ordinates. Please add next time or ask for a correction to this photo.



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

5 Comments
  1. Thanks for this Liam. Good to see railway switching action once again at the Oshawa GM Plant, and totally agree with your thoughts, after a long hard struggle, UNIFOR & City of Oshawa – 1, greedy GM – 0. Has CP started delivering cars to this plant ? Note the new sign “End of Track” – guess that’s where CN takes over from G&W. Very nice to see G&W orange, rather than CN black & red. Reflecting back to 1955 when I first saw OR electric motors switching the old GM North plant and hauling 15, maybe 20 cars through downtown Oshawa streets to the CNR, so much has changed. Thanks for braving the cold, John

  2. Thanks John! CP has run a couple of T10s with autos to Oshawa, but on no set schedule as of yet.

  3. Nice photo Liam. Apparently G&W is contracted to operate this new operation for Synergy Rail if I have that correct.

  4. That sounds correct as the job is officially called Railsynergy Oshawa.

  5. railwayguy,

    I’m not sure where CN officially takes over but that is the end of the line. There at one time was a yard to the left here where in 2009 you can see was filled with racks to be loaded. it was removed sometime after 2012 and that track and one track left there in place as stubs.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us