Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Heading south on a loaded coal train, at the north switch Tumbler siding. Just over the switch is the wye at Tumbler and in the distance is a ballast train in the siding. The roadbed, track and ballast are just in the final stages of completion on the newly opened BC Rail Tumbler Subdivision serving the long awaited  BC "north east coal fields" and coal mines.
Image taken from the cab of a CN locomotive, no GF6C electric units leading this time.
The scenery was fantastic, the train trips were long and this late evening image is no exception, "it'll be an all niter".
Copyright Notice: This image ©Doug Lawson all rights reserved.



Caption: Heading south on a loaded coal train, at the north switch Tumbler siding. Just over the switch is the wye at Tumbler and in the distance is a ballast train in the siding. The roadbed, track and ballast are just in the final stages of completion on the newly opened BC Rail Tumbler Subdivision serving the long awaited BC "north east coal fields" and coal mines. Image taken from the cab of a CN locomotive, no GF6C electric units leading this time. The scenery was fantastic, the train trips were long and this late evening image is no exception, "it'll be an all niter".

Photographer:
Doug Lawson [248] (more) (contact)
Date: 05/??/1984 (search)
Railway: BC Rail (search)
Reporting Marks: Not Provided
Train Symbol: south coal train (search)
Subdivision/SNS: Tumbler siding (search)
City/Town: Tumbler (search)
Province: British Columbia (search)
Share Link: http://www.railpictures.ca/?attachment_id=37671
Click here to Log-in or Register and add your vote.

8 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1289 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 36478

Sorry, there is no map for this photo. Photographer did not add GPS co-ordinates. Please add next time or ask for a correction to this photo.



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

2 Comments
  1. Wonder how, with no catenary, GMD tested out the GF6C’s over in London?

  2. Interesting question about testing the units. I really don’t know if or much testing could be done at the GMDL plant in London. I suppose some type of “load box” testing might have been possible. I do know that there were a lot of GMDL technicians riding with the units while in initial stages of operation on BC Rail as well as technicians from the company that made the high voltage heavy electrical equipment.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us