Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



Passing through rock cuts south of Long Lake, CP 4223 leads two other MLW C424 sisters heading southbound on the Nephton Sub at County Road 44 crossing (Mile 10), heading back down to Havelock with traffic from Nephton and Blue Mountain. Timetables indicate the speed on this line in 1987 was a pokey 30mph max, with some 20mph stretches, so the units wouldn't have been moving too quickly through here (although there are grades on the line to tax the power, including a few 1.8% - 2% climbs).  CP's Nephton Sub was constructed in 1954 through rock cuts and swampland as a 16-mile line (later extended to 20 miles) north from Havelock to serve the American Nepheline Ltd's nepheline syenite mines at Nephton and Blue Mountain, still in operation today under Unimin. Those mines are the sole traffic generated on the Nephton Sub, and very likely the main reason it and the Havelock Sub haven't been abandoned by CP yet.  Peter Mumby photo, Dan Dell'Unto collection slide.
Copyright Notice: This image ©Peter Mumby photo, Dan Dell'Unto coll. all rights reserved.



Caption: Passing through rock cuts south of Long Lake, CP 4223 leads two other MLW C424 sisters heading southbound on the Nephton Sub at County Road 44 crossing (Mile 10), heading back down to Havelock with traffic from Nephton and Blue Mountain. Timetables indicate the speed on this line in 1987 was a pokey 30mph max, with some 20mph stretches, so the units wouldn't have been moving too quickly through here (although there are grades on the line to tax the power, including a few 1.8% - 2% climbs).

CP's Nephton Sub was constructed in 1954 through rock cuts and swampland as a 16-mile line (later extended to 20 miles) north from Havelock to serve the American Nepheline Ltd's nepheline syenite mines at Nephton and Blue Mountain, still in operation today under Unimin. Those mines are the sole traffic generated on the Nephton Sub, and very likely the main reason it and the Havelock Sub haven't been abandoned by CP yet.

Peter Mumby photo, Dan Dell'Unto collection slide.

Photographer:
Peter Mumby photo, Dan Dell'Unto coll. [992] (more) (contact)
Date: 08/05/1987 (search)
Railway: Canadian Pacific (search)
Reporting Marks: CP 4223 (search)
Train Symbol: Not Provided
Subdivision/SNS: Mile 10 - CP Nephton Sub (search)
City/Town: Nephton (south of) (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=37171
Click here to Log-in or Register and add your vote.

13 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1904 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 35979

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

2 Comments
  1. Awesome – thanks for posting this one!

  2. Spent a day railfanning this line back in 2005. There are not many crossings or access points due to the terrain mentioned in the caption, but certainly a neat operation to see. The C424′s were long gone by then and they were using GP38-2′s with a caboose still!

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us