Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community!
click here to sign up for an account today. Sick of this message? Get rid of it by
logging-in here.
Looks like those white hats are from engineering, probably looking at the tracks or the rail crossing.
I see that 806 is a non powered slug and the SD45 coupled to it is a remote?
behind 806 is 3806, a GP40X.
Oops, my bad. The flared rad fooled me
How many eyes does it take to see a rail crossing? This is as bad as 6 road guys fixing a pot hole !!!
The hardhats are G&W and Metrolinx/GO folks. Metrolinx has a lot of catching up to do now that they own the line to Kitchener.
To bring Guelph’s speeds up many crossings will have to be closed or underpassed and track reconfiguration may have to occur. Plans will be made public once consultations are to begin. Right now, it’s all a guessing game to what is coming.