Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



On the curve approaching the entrance to the OPG Pickering compound, HEPX 200 is gingerly eased towards it's final destination. Though it seems odd on the surface to catch a six axle the size of a C44-9W on a seldom used spur, given the weight of the typical shipment on the spur, it's actually pretty appropriate. They even left the buffer gons behind at the run around track a little ways north. 1400hrs.
Copyright Notice: This image ©Mike Lockwood all rights reserved.



Caption: On the curve approaching the entrance to the OPG Pickering compound, HEPX 200 is gingerly eased towards it's final destination. Though it seems odd on the surface to catch a six axle the size of a C44-9W on a seldom used spur, given the weight of the typical shipment on the spur, it's actually pretty appropriate. They even left the buffer gons behind at the run around track a little ways north. 1400hrs.

Photographer:
Mike Lockwood [264] (more) (contact)
Date: 04/26/2015 (search)
Railway: Canadian National (search)
Reporting Marks: CN 2622 (search)
Train Symbol: CN L350 (search)
Subdivision/SNS: CN Pickering Spur (search)
City/Town: Pickering (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=18864
Click here to Log-in or Register and add your vote.

10 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 2742 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 17756

Sorry, there is no map for this photo. Photographer did not add GPS co-ordinates. Please add next time or ask for a correction to this photo.



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

8 Comments
  1. I,d like to see A side view of this car.

  2. Trying to find this on Google maps. Nice pic, Mike.

  3. Pierre, I shot a few of the car, suppose I could post one. No roster shots though… big subject.

    Cam, it’s the final curve before the tracks cross Brock Road and enter the Hydro compound.

  4. Nice shot. I was the engineer on the train that day. The Schnabel car had to be moved at 1mph around the west leg of the wye at Pickering. The Hydro spur is used a couple times a week. 6 axle units are not normally permitted on industrial trackage. Special permission was given for that unit and I was restricted to 10mph on that track.

  5. ngineered4u,

    I was the one who shot you guys at Liverpool and Bayly St. Really cool move.

  6. Thanks ngineered4u;

    I assume the recycling plant and the water treatment are the regular customers on the spur, and served by 548 (or is it 546) out of Oshawa at night? Only ever seen the Hydro moves on the spur, and only once before.

  7. I am not sure what customers are on that lead anymore, but there are a couple. Hydro moves are common though.

  8. Looks like the Water Treatment plant, K&K Recycling, and Hydro One’s central maintenance facility (where HEPX 200 is stored) are all that is left on the spur. There appears to be a fairly new spur by the IMOS facility at the wye too.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us