Welcome Visitor. First time here? Like what you see? Bookmark us for when you are bored, and check out 'top shots' and 'fantastic (editors choice)' in the menu above, you won't be dissapointed. Join our community! click here to sign up for an account today. Sick of this message? Get rid of it by logging-in here.



More Ch-Ch-Ch-Ch-Changes. A few new signals have sprouted at James St North - and crews are still busy building the parking garage/station and  platform. Apparently they want to squeeze some GO service in here in a months time... after all all you need is a platform and a staircase.. right?? I say no way it'll make it in time - but then again, stranger things have happened with GO expansion..
The signal at far left - protects the main track - wouldn't Rule 27 apply requiring a 564 (Authority to pass - most restrictive signal would be red!). Normally you'd expect the signal to be turned unless commissioning was imminent..
Copyright Notice: This image ©Stephen C. Host all rights reserved.



Caption: More Ch-Ch-Ch-Ch-Changes. A few new signals have sprouted at James St North - and crews are still busy building the parking garage/station and platform. Apparently they want to squeeze some GO service in here in a months time... after all all you need is a platform and a staircase.. right?? I say no way it'll make it in time - but then again, stranger things have happened with GO expansion..

The signal at far left - protects the main track - wouldn't Rule 27 apply requiring a 564 (Authority to pass - most restrictive signal would be red!). Normally you'd expect the signal to be turned unless commissioning was imminent..

Photographer:
Stephen C. Host [1535] (more) (contact)
Date: 05/23/2015 (search)
Railway: Amtrak (search)
Reporting Marks: Amtrak 76 (search)
Train Symbol: VIA 97 (search)
Subdivision/SNS: Oakville Subdivision (search)
City/Town: Hamilton (search)
Province: Ontario (search)
Share Link: http://www.railpictures.ca/?attachment_id=19108
Click here to Log-in or Register and add your vote.

5 Favourites
Photographers like Gold.Log-in or Register to show appreciation
View count: 1808 Views

Share this image on Facebook, Twitter or email using the icons below
Photo ID: 17998

Map courtesy of Open Street Map

Full size | Suncalc



All comments must be positive in nature and abide by site rules. Anything else may be removed without warning.

4 Comments
  1. Not soon enough. I’ll be on the Stuart street bridge today taking pics after bussing it in from Aldershot (train from Toronto).

  2. I could see GO having a temporary pedestrian level crossing, like the ones at Bradford. The project does look very rushed as you mentioned though. From rumours I’ve heard, the Niagara GO excursion trains will simply glide past the station when it’s done, which baffles me. It would be interesting if Via Rail used it as a mini-hub for Niagara and London-Windsor trains, but that’s just fantasy.

  3. Yes Daniel, that is pure fantasy. VIA will not use it as a hub, period. That’s what Aldershot is.

    They won’t ever go back. I have my doubts VIA will use the station either. They should..

    Niagara trains will bypass Hamilton for now – how many sides do you want to disembark from? Each side has to be prepared and ready with a platform – do you want to create two platforms or one on time for June?

  4. So this control point is now in service – CN “Stuart” is the name, went in service 0300 on Saturday May 30th.

Railpictures.ca © 2006-2024 all rights reserved. Photographs are copyright of the photographer and used with permission
Terms and conditions | About us