Caption: Having just come down the Owen Sound Spur from Orangeville on the left, the engineer peers out of the cab of CCGX 1000 as the biweekly Orangeville Brampton Railway local backs their train of interchange cars into the siding at Streetsville for CP to lift. Upon making the setoff, the crew will run their high-nose GP9 around to the north end, lift the 5 covered hoppers CP set off, and head back up the line homeward.
|